Play Video
09.09.2020

Thermal dangers with power lines Soil thermal resistivity testing and underground Power lines

When there is construction of structures whether it is a pipeline, a subdivision or road works there is damage done to the natural environment. Once this happens it is often incumbent before, during and after the structure has been built for environmental testing, monitoring, supervision and rehabilitation to take place. Tempsand has experienced personal that can take the hassle and the guess work away from these processes. With our experienced environmental staff we can offer a comprehensive service to the design parameters set by the engineering authority. This can include but not limited to the careful identification, temporary removal, preservation and re establishment of the protected species of flora to their original surrounding where possible. If construction is not a problem but contamination of your site has occurred due to unfortunate practices of the past we are able to assist in the identification of the suspect material and its removal and remediation. We would be pleased to help with your environmental rehabilitation challenge.